|
|
Comprehensive School Improvement
Annual Progress Report (APR)
| The new APR Web-Based System is now open for school use. |
| |
Web Site Access Public School Districts |
| |
You will use the following web site address:
https://www.edinfo.state.ia.us/securelogin.asp
which takes you to a log-in screen. Contact your superintendent for
log-in and password. |
| |
Web Site Access Accredited Nonpublic Schools |
| |
You will use the following web site address:
https://www.edinfo.state.ia.us/securelogin.asp
which takes you to a log-in screen. Contact the person who completes
the certified annual enrollment for your building or system for
log-in and password. |
| |
APR Data Collection for Nonpublic Schools |
| |
The following information pertains only to the data displays section of the 2005-2006 Annual Progress Report for Non-Public Schools:
It was the intent of the Department of Education (DE) to utilize Iowa Testing data to create data displays section for the 2005-06 Annual Progress Reports (APRs) for all non-public schools.
We have learned that it will not be possible for 2005-2006 APR reporting (due September 15, 2006). As part of our plan to pre-populate these data directly into future non-public schools’ APRs, the DE may be requesting written permission from each non-public school administrator to allow the Iowa Testing Program to release those data directly to the DE.
Such permission will allow the DE to create an electronic document for non-public schools that mirrors public school districts’ APRs. For the current APR (2005-06 data), please complete the attached form and submit it electronically to Holly Barnes at holly.barnes@iowa.gov. If you have questions, please call Holly at 515-242-6173. |
 |
APR Data for Accredited Non-Public Schools 2005-06 |
 |
APR Data for Accredited Non-Public Schools 2005-06 |
| |
| APR Checklists for Schools/Districts Not Filing Electronically (Schools/Districts are STRONGLY encouraged to file the electronic version.) |
| Public Checklist |
 |
posted 7/6/06 |
 |
posted 7/6/06 |
| Nonpublic Checklist |
 |
posted 7/6/06 |
 |
posted 7/6/06 |
Electronic Annual Progress Report (APR) for 2005-06
An electronic version of the 2005-06 APR will be launched this summer, and all districts will be encouraged to participate.
DE staff will pre-populate most of the data reporting requirements from the Project EASIER data system (non-public schools that do not use Project Easier will be able to report student achievement data manually on this system later in the summer). Districts/schools will be asked to input the information for the portions of the APR that cannot be pre-populated. This process will be much like the process used to complete the Comprehensive School Improvement Plans (CSIPs) using text boxes (though districts will be required to fill out much less information for the APR than the CSIP). |